About YUSHUNXIN
We are an equipment manufacturer, not a recycling company. What we bring to a PV module project is twenty years of building machines that take materia




The machine is built and checked against its drawings before anything is run.
Pneumatic positioning, the cutting head and both press movements are cycled and observed.
The upper hydraulic press unit is adjusted and commissioned at the works. This is the setting the equipment brief advises against changing casually on site.
The machine is run through its cycle so that the timing matches the published cycle before it is crated.
Drawings, consumable parts list, the setting record and the recommended spares list are prepared for handover.
We do not publish certification marks on this site for scopes that have not been independently assessed, and we do not describe quality systems we have not had assessed for the products concerned. Where a certificate is relevant to a project, it is provided with the commercial offer, with its scope and validity stated.
What we can state plainly is what happens in our own works: machining, fabrication, assembly and testing of the machine before it ships, and a documented handover pack at commissioning. Buyers evaluating a supplier should ask for exactly that, from anyone they are considering.
Tell us which machine and which module type. We will confirm what is in build or available to run on the date you plan to visit.
Machining, fabrication, assembly and pre-dispatch testing are carried out at our 60,000 m² works in Xingyang, Zhengzhou, rather than subcontracted across a supplier network. That is what keeps tolerances and delivery under our own control.
Yes. Machines are assembled, function-tested and cycled in our works, and the frame removal machine's hydraulic press unit is adjusted and commissioned there before dispatch. The equipment brief advises against casual changes to that setting on site.
Drawings, the consumable and wear parts list, the setting record and the recommended spares list, plus the foundation and utility interface drawings needed for site preparation.
Where a certificate applies to the product being quoted, it is supplied with the commercial offer together with its scope and validity. We do not display certification marks on this site for scopes that have not been assessed.
Tell us what arrives at your gate and what has to leave. The engineering team replies with the station configuration, the scope boundary and the information still missing before drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].
Three details are enough to start: what modules you receive, how fast you need to process them, and what output you have to produce.